---
updatedAt: 2026-07-24T13:37:57.000Z
agentTools:
  projectIndex: https://doc.superannotate.com/llms.txt
---

# Assign/Request items

## **Assign items**

To assign an item:

1. Select one or multiple items.
2. Click **Assign** on the floating bar.
3. Select the contributors you want to assign for any role available in your project.
4. Click **Assign**.

<Callout icon="📘" theme="info">
  - When it says **Multiple Assignments** under the **Annotator**, **QA**, or **Custom role** fields, it means that there are multiple contributors assigned to the different item(s) you selected.
  - When you assign items to a contributor, they will see those items within the project after refreshing the page, as long as the item’s status is available to their role.
  - You can assign any item to a contributor regardless of item status or the user’s role. However, the role must have access to the current status of the item in order for the task to be visible for them. E.g. **QA**s can’t see items with the **Not Started** status, but **Annotators** can. Once the item status is set to **Quality Check**, the **QA** will be able to see it if it’s already been assigned.
</Callout>

<Callout icon="🚧" theme="warn">
  - You can assign items only to to **Annotators**, **QAs**, and applicable **Custom roles**.
    - You can also assign items to pending users.
    - You can’t assign items or folders to a user if their activity in that project is paused.
</Callout>

<Callout icon="❗️" theme="error">
  When you change the role of a non-admin contributor, all the items assigned to them will be unassigned.
</Callout>

## **Unassign items**

To unassign a items:

1. Select one or multiple items.
2. Click **Assign** on the floating bar.
3. In the pop-up, click the **X** button next to the names of the contributors you want to unassign.
4. Click **Assign**.

To remove all the assignments:

1. Select one or multiple items.
2. Click **Assign** on the floating bar.
3. Click **Remove Assignments**.

## **Request items**

To request items, click **Request tasks** in the **Data** tab.

<Callout icon="📘" theme="info">
  Only non-admin contributors can request items. They'll be automatically assigned up to the number of items that's set in <Anchor target="_blank" href="https://doc.superannotate.com/docs/multimodal-project-settings#task-request-settings">Task Request Settings</Anchor> in **Settings**. The minimum number is 1 and the maximum number is 200.
</Callout>

<Callout icon="🚧" theme="warn">
  If the **Priority scores** task assignment setting is enabled for your project, then contributors will receive items by priority score.
</Callout>

### Request by Category

<Image src="https://files.readme.io/3f4c272-request-by-category.png" align="center" />

For projects with **Category** enabled, **Annotators**, **QAs** and users with applicable custom roles can request tasks by category. To request items this way, this feature must be enabled in the [project settings](https://doc.superannotate.com/docs/multimodal-project-settings#request-by-category), and the users requesting items must have categories added to them.

To request tasks by category:

1. In the **Data** tab, click **Request Tasks**.
2. In the pop-up, select one or multiple categories from the dropdown.
3. Click **Request**.

<Callout icon="📘" theme="info">
  You can also request tasks from the editor, once you’ve finished working on your last item.
</Callout>

### Received item status

* **Annotators** receive items with the following statuses: **Not started**, **In progress**, and **Returned**.
* **QAs** receive items with the **Quality Check** status.
* **Custom roles** receive items based on the structure of a custom project workflow.

<Callout icon="📘" theme="info">
  ### Batch Size

  - **Annotators**, **QAs** and users with applicable **custom** roles can request a number of items based on the project's batch size.
  - **Skipped** items aren't counted towards the batch size limit.
  - Items will be removed from a contributor's item list if:
    - An **Annotator** marks an item for **Quality Check**, or marks it as **Completed** if they have permission.
    - A **QA** marks an item as **Returned** or **Completed**.
  - When an item is removed from a contributor's batch, they'll have space to request a number of items up to their project's batch size. The contributor doesn't have to process the entire batch to request more.
</Callout>

### Item receiving order

There are a few conditions that determine the order in which **Annotators**, **QAs** and users with applicable **custom** roles receive their requested tasks. **Automatic assignment** must be enabled for these conditions to be considered.

Additionally, if you’ve enabled any task request sub-setting, it may change the behavior of these conditions, as listed in the [Setting-based conditions](https://doc.superannotate.com/docs/multimodal-assign-request-items#settings-based-conditions) table below.

<Table align={["left","left"]}>
  <thead>
    <tr>
      <th>
        Condition
      </th>

      <th>
        Item receiving order
      </th>
    </tr>
  </thead>

  <tbody>
    <tr>
      <td>
        If there's a folder
      </td>

      <td>
        Users will first receive items from the folder, then they'll receive the items from the project’s root (if available) in ascending alphabetical order.
      </td>
    </tr>

    <tr>
      <td>
        If there are multiple folders
      </td>

      <td>
        Users will first receive items from the folders, then they'll receive the items from the project’s root (if available) in ascending alphabetical order.
      </td>
    </tr>

    <tr>
      <td>
        If there is no folder
      </td>

      <td>
        Users will receive items from the project’s root in ascending alphabetical order.
      </td>
    </tr>

    <tr>
      <td>
        If the user has folders assigned to them
      </td>

      <td>
        The user will first receive the items from the assigned folders, then they'll receive items from the other folders and the project’s root.
      </td>
    </tr>

    <tr>
      <td>
        If the number of items available in the first folder is smaller than the number of [Task Request Settings](https://doc.superannotate.com/docs/settings#request-item-number) in **Settings**
      </td>

      <td>
        Users will receive the remaining items from the next folder in ascending alphabetical order (by default) or by priority value (if enabled).

        For example:
        Suppose a project has a **Batch size** number of 50 and contains the following folders: **Folder A** (40 items), and **Folder B** (30 items). When the **Annotator** or **QA** request items, they'll receive 40 items from **Folder A** and then 10 items from **Folder B**, to a total of 50 items.
      </td>
    </tr>
  </tbody>
</Table>

<Callout icon="❗️" theme="error">
  - An **Annotator** can't receive items from folders assigned to other **Annotators**.
    - A **QA** can't receive items from folders assigned to other **QAs**.
</Callout>

### Settings-based conditions

There are two sub-settings that can further define your project’s task assignment. Only one of these settings may be enabled at one time.

<Table align={["left","left"]}>
  <thead>
    <tr>
      <th>
        Condition
      </th>

      <th>
        Item receiving order
      </th>
    </tr>
  </thead>

  <tbody>
    <tr>
      <td>
        Priority score assignment
      </td>

      <td>
        **Annotators**, **QAs** and users with applicable **custom** roles will receive items based on their priority scores, prevailing over the default item order (alphabetical).For example, let’s say your project has the following folders: `Folder A` and `Folder B`. `Folder A` has a few items with different priority scores, and some items without any priority scores. `Folder B` contains several items with higher priority scores than the items in `Folder A`.Contributors will first be assigned items from `Folder A`, sorting these items by priority scores in descending order. Once all items with priority scores have been completed, contributors will then be assigned items without priority scores, until all items in `Folder A` are completed.

        Once the last item from `Folder A` has been assigned and/or completed, items from `Folder B` will be considered.

        This means that item priority scores are considered within each folder only, and not across different folders.
      </td>
    </tr>

    <tr>
      <td>
        Random assignment
      </td>

      <td>
        **Annotators**, **QAs** and users with applicable **custom** roles will receive items at random from locations they have access to. This could be: the project's root, assigned folders (if any), and unassigned folders (if any).
      </td>
    </tr>
  </tbody>
</Table>

<br />